Compression Joint Flashing
Essential Flashing
- Used in conjunction with Ultimate Horizontal/Vertical Starter Tracks at floor joists in buildings that require compression joints
Available finishes & lead times:
- Primed - 5 days
- Clear Anodized - 5 days
- Powder Coated - 5 days to 4 weeks
Custom Color - 8-10 weeks
Weight (lbs. per piece)
1.8
Packaging (ln. ft. per tube)
50
*This accessory is designed for use in the prescribed manner with designated Nichiha products only. Use with other products or in other manners is not warranted.